Search Results
- IDNO:
- 000024
- Title:
- Celebrating Paving of Highway
- Date:
- ca. 1925-1930
- Description:
- Celebration of completion of a highway project. The picture features a crowd and numerous parked automobiles in the vicinity of a highway through a rural area in north central West Virginia.
- IDNO:
- 025154
- Title:
- Road Crew at Work
- Description:
- Workers use a horse drawn tool to dig up a dirt road for improvement project.
- IDNO:
- 025155
- Title:
- Road Under Construction
- Date:
- 1912/09
- Description:
- Bricks stacked beside the road bed.
- IDNO:
- 025607
- Title:
- Cement Mixer Delivering Concrete to Road Bed
- Description:
- Road building crew paving a road.
- IDNO:
- 025608
- Title:
- Cement Mixer Delivering Concrete to Road Bed
- Description:
- Paving a new West Virginia Road.
- IDNO:
- 053133
- Title:
- Cooper's Rock Interchange on Corridor "E", Near Morgantown, W. Va.
- Date:
- 1971/11/09
- Description:
- Text on the back reads, "The above aerial photo from the Department of Highways shows the area of Corridor "E" which includes the Cooper's Rock interchange in Cooper's Rock State Forest. The Harry Miller Excavating Company of Suffield, Ohio, is contractor for the work. Some 23 miles of construction currently is under way on the corridor in Monongalia and Preston counties at a cost of $50 million. The construction extends from near the western boundary of the forest all the way to the Maryland State Line, and also includes a three-mile segment which connects with Interstate 79 at Morgantown. Corridor "E" will be a four-lane highway from I-79 to the Maryland line for a total length of 31 miles."