Search Results

1. Lumber Yard, Mine No. 303, Elk Horn Mining Corporation, Eastern Kentucky

2. Showing Part of Progress Made Prior to Completion of Elk Horn and Beaver Valley Railway, Wayland, Ky.

On the front: "Substation- reducing current from 40,000 volts to 250 volts."

3. Substation, Elk Horn Mining Corporation, Eastern Kentucky

On the front: "Five teams- six mules each team- hauling building material from mouth of Beaver Creek, a distance of twenty-five miles, prior to arrival of railroad."

4. Teams of Mules Hauling Building Material From Mouth of Beaver Creek, Elk Horn Mining Corporation, Eastern Kentucky

Elk Horn Mining Corporation, Eastern Kentucky

5. Hauling Mine Supplies and Building Material Over the Mountains for Construction Work

6. Tipple Under Construction, Mine No. 303, Elk Horn Mining Corporation, Eastern Kentucky

7. First Coal Loaded in Railroad Cars, Tipple, Mine No. 301, Elk Horn Mining Corporation, Eastern Kentucky

8. Tipple, Mine No. 330, Elk Horn Mining Corporation, Eastern Kentucky

9. Tipple, Mine No. 329, Elk Horn Mining Corporation, Eastern Kentucky

10. First Coal Loaded in Railroad Cars, Tipple, Mine No. 328, Elk Horn Mining Corporation, Eastern Kentucky

11. Mine Motor Bringing Out a Trip of Loaded Cars, Elk Horn Mining Corporation, Eastern Kentucky

12. Mine Opening No. 301,Elk Horn Mining Corporation, Eastern Kentucky