Search Constraints

You searched for: Date undated Remove constraint Date: undated Geographic Names Bluestone River (Va. and W. Va.) Remove constraint Geographic Names: Bluestone River (Va. and W. Va.) Medium print Remove constraint Medium: print Projects West Virginia History OnView Remove constraint Projects: West Virginia History OnView
Number of results to display per page

Search Results

A group of unidentified workers from the Civilian Conservation Corps pose on the ferry which was built to cross New River to save workers the hassle of having to drive to Hinton and cross the river at the old toll bridge. The ferry then took the men up the Bluestone River where "the clearing of right of way was started", according tot he photo caption.
Cranes are positioned at the bottom of the construction site. Houses can be seen in the background.
The tall support structure is covered by construction beams.
A crane and other construction equipment surrounds the construction site. The bridge looks at Larkin Meador farm, pictured to the left, and up Pipestem Creek.
A close-up look at the bent bridge steel.A week after the collapse the men began dismantling the twisted span, using a never before used technique by burning the steel beams with chemicals.Five workmen killed and four injured when the 300-ton span buckled and folded downward into the mouth of Bluestone River.
Looking at the beginning of a reservoir created by the Bluestone Dam. To the right of the area pictured is the mouth of the Bluestone River.
Looking over the reservoir created by  Bluestone River Dam from the dirt road.
At the far side of the photo is John Barker's farm in the background. Near the side of the river is Hoke Neely farm at Surveyor Branch.