Shows earth moving equipment in place after the lawn was removed but before major excavation in front of Wise Library began.  Front entrance was still open.

1. Downtown Library Complex during Construction, West Virginia University

Shows earth moving equipment in place after the lawn was removed but before major excavation in front of Wise Library began.  Front entrance was still open.

2. Downtown Library Complex during Construction, West Virginia University

Shows early excavation work in progress in front of Wise Library. Front entrance closed.  Side entry to Wise was the main entrance to the library at this stage.

3. Downtown Library Complex during Construction, West Virginia University

Shows early excavation in front of Wise Library.  Outer wall of basement level of Wise is visible.