Search Results

Miner waiting for shuttle car to be loaded.

19. Shuttle Car Being Loaded

Miners stand next to a large locomotive at Jamison No. 9.

20. Jamison No. 9 Mine Locomotive

Two miners work on putting in roof bolts in the Pittsburgh Seam. Timber jack used to hold the roof while bolting.

21. Miners Roof Bolting

Two miners drill before placing charges.

22. Drilling Prior to Setting Explosives

Miner works at unloading a shuttle car into an elevator.

23. Shuttle Car Unloading into an Elevator

Miner works at the control panel at Jamison No. 9.

24. Control Panel at Jamison No. 9