1. Ireland Mine Portal Area Supply Slope

'Two Joy 3-JCM and one Goodman 300 continuous miners are now in service producing coal. These machines have roof bolting machines as an integral part of their equipment. Two Joy 3-JCM machines are also being used brushing top and bottom where additional height is needed in the main haulage entries.'

2. Ireland Mine Machine Shop Fully Equipped

'The Plus 6" coal will be crushed to minus 1.5" and two 16,6" Chance Cones will wash the 6 x 3/8 coal. Current production of approximately 1800 tons per day is crushed to minus 1.25" then trucked to the storage yard of the new Kammer Power plant.'

3. Ireland Mine Preparation Plant

Cars and machinery are parked outside mine plant buildings.

4. Ireland Mine Shamrock Portal Shop and Supply Slope

Buildings at the Ireland Mine.

5. Ireland Mine Shamrock Portal Lamphouse, Bathhouse, and Warehouse

Large building with cars and a few people outside.

6. Ireland Mine Portal Area Shop and Warehouse Building