Search Results

Miner at control board at Jamison No. 9.

49. Control Board at Jamison No. 9

Miner setting charges at Jamison No. 9.

50. Setting Explosives at Jamison No. 9

Two miners drill before placing charges.

51. Drilling Prior to Setting Explosives

Two miners work with a Joy roof bolt drill at Jamison No. 9.

52. Joy Roof Bolt Drill at Jamison No. 9

Miner works at the control panel at Jamison No. 9.

53. Control Panel at Jamison No. 9

Miners ride in a locomotive at Jamison No. 9.

54. Jamison No. 9 Mine Locomotive

Jeffrey 290 cutting trench for 2200 volt line at Jamison No. 9.  Stonega Coke and Coal.

55. Jeffrey 290 cutting trench for 2200 volt line at Jamison No. 9

Miner using a 11 BU loading machine at Jamison No. 9. Stonega Coke and Coal.

56. Miner Operating a Loading Machine at Jamison No. 9

A Joy 10 RU preparing to cut US Royal Cable at Jamison No. 9.  Stonega Coke and Coal.

57. Joy 10 RU Preparing to Cut US Royal Cable at Jamison No. 9

Miner running a continuous mining machine.

58. Continuous Mining Machine

Two miners dust the rocks at Consol Mine No. 207 for safety.

59. Rock Dusting at Consol. Mine No. 207

An 11BU loading machine and a Joy Shuttle car at Jamison No. 9.  Stonega Coke and Coal.

60. Loading Machine and Shuttle Car at Jamison No. 9