Search Results

Coal traveling on conveyors. Credit Must Be Given. Not to be reproduced without written license from William Vandivert.

613. Coal Being Processed

Coal on a conveyor.

614. Oil Treatment, Stoker Coal

Miner examines coal traveling down a conveyor inside the Hutchinson Preparation Plant, Pittsburgh Consolidation Coal Company.

615. Interior of the Hutchinson Preparation Plant

'Link-Belt 33460, Link-Belt rotary mine car dumper at Heavy-Media coal preparation plant of Pocahontas Fuel Co. Inc., Itmann, W. Va. Capacity of plant is 750 tons of raw coal per hour. Nov. 1951'

616. Link-Belt Rotary Mine Car Dumper, Pocahontas Fuel Company, Itmann, W. Va.

Scenic view of Consolidated Coal Company's Mine No. 32.

617. Consolidation Coal Company Mine No. 32, Fairmont, W. Va.

The incline is 4360 feet long and has a vertical rise of 1335 feet. Six cars each carrying 4 tons each would be loaded each trip.

618. Incline at Clover Splint Mine

Scenic view of Mine No. 32 at Fairmont, W. Va.

619. Consolidation Coal Company Mine No. 32, Fairmont, W. Va.

Conveyor belt in the middle of the mountains.

620. Raw Coal Conveyor System

Scenic view of buildings and houses at Mine No. 32, Fairmont, W. Va. 'Credit must be given. Not to be reproduced without written liscense from William Vandivert.'

621. Consolidation Coal Company Mine No. 32, Fairmont, W. Va.

Filled coal cars outside of the Preparation Plant.

622. Champion No. 1 Preparation Plant

Side view of the preparation plant located on the B&O RR, Owings, W. Va.

623. Mine No. 32, Owings, W. Va.

Cars and machinery are parked outside mine plant buildings.

624. Ireland Mine Shamrock Portal Shop and Supply Slope