Search Results

169. Balasting Tramroad with Crushed Rock, No.6 Bartley, Island Creek Coal Company, Beartown Project

170. Empty and Load Track 1400 Feet From the Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

171. Tramroad 2000 Feet From the Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

172. Empty and Load Tracks at the Cross Over, No. 6 Bartley, Island Creek Coal Company, Beartown Project

173. Tramroad Showing Trolley Supports, No. 6 Bartley, Island Creek Coal Company, Beartown Project

174. Connecting Last Link of Track Between Portal and Head House, No. 6 Bartley, Island Creek Coal Company, Beartown Project

175. Track Work Near Crusher and Temporary Rock Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

176. Tipple Gallery and Head House, No. 6 Bartley, Island Creek Coal Company, Beartown Project

"Showing control box, parts of shakers, wash box, raw coal conveyor, and lighting arrangement."

177. Inside of Tipple, No. 6 Bartley, Island Creek Coal Company, Beartown Project

178. Headhouse Installing Kickback, No. 6 Bartley, Island Creek Coal Company, Beartown Project

179. Looking Down Gallery Showing Tipple, Railroad Tracks, Tank Location, and Ditch for Water Lines, No. 6 Bartley, Island Creek Coal Company, Beartown Project

180. Tipple, Gallery and Headhouse, No. 6 Bartley, Island Creek Coal Company, Beartown Project