Search Results

181. Headhouse, No. 6 Bartley, Island Creek Coal Company, Beartown Project

182. Excavation for Boiler House Foundation, No. 6 Bartley, Island Creek Coal Company, Beartown Project

183. Gallery, No. 6 Bartley, Island Creek Coal Company, Beartown Project

184. Balasting Tramroad with Crushed Rock, No.6 Bartley, Island Creek Coal Company, Beartown Project

185. Empty and Load Track 1400 Feet From the Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

186. Tramroad 2000 Feet From the Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

187. Empty and Load Tracks at the Cross Over, No. 6 Bartley, Island Creek Coal Company, Beartown Project

188. Tramroad Showing Trolley Supports, No. 6 Bartley, Island Creek Coal Company, Beartown Project

189. Connecting Last Link of Track Between Portal and Head House, No. 6 Bartley, Island Creek Coal Company, Beartown Project

190. Track Work Near Crusher and Temporary Rock Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

191. Tipple Gallery and Head House, No. 6 Bartley, Island Creek Coal Company, Beartown Project

"Showing control box, parts of shakers, wash box, raw coal conveyor, and lighting arrangement."

192. Inside of Tipple, No. 6 Bartley, Island Creek Coal Company, Beartown Project